Case study Braintree Sewage treatment works, Essex, Reino Unido

A Moving Bed™biofilm process for removal of BOD and total nitrogen.

  • Operational since: 1998.

Design data

Parameter Value
Total BOD5 1 592 kg/d
NH4-N 196 kg/d
TKN 294 kg/d
SS 1 838 kg/d
Design flow 8 160 m³/h
PE 28 000

Effluent requirements

Parameter Value
BOD5 <16 mg/l
TN >60% average reduction
NH4-N <8 mg/l
TP <2 mg/l
SS <32 mg/l

Results

Since commissioning the plant has performed well with up to 73% removal of total nitrogen and complete nitrification.