Case study Highland Creek WWTP, Toronto, Canadá
One-year study to investigate nitrification and pre-treatment ahead of existing activated sludge treatment.
- Operational since: 2002.
Design data
| Parameter | Value |
|---|---|
| BOD5 | 2926 kg/d |
| TKN | 553 kg/d |
| TP | 73 kg/d |
| SS | 3 329 kg/d |
| Design flow | 17 979 m³/d |
| Maximum flow | 30 280 m³/d |
| PE | 20 000 |
| Temperature range | 15-22°C |
Effluent requirements
| Parameter | Value |
|---|---|
| NH4-N | <2 mg/l |
| BOD5 | <15 mg/l |
Results
No results available .
