Case study Steinsholt WWTP, Noruega

The first full scale plant with K1 carrier material.

  • Operational since: 1990.

Design data

Parameter Value
BOD7 43.8 kg/d
Design flow 10.25 m³/h
PE 625

Effluent requirements

Parameter Value
Phosphorous <1 mg TP/l
BOD7 <20 mg/l

Results

Parameter Influent (mg/l) Effluent(mg/l) Reduction (%)
Total COD 514 33 94
Total BOD7 289 11 96.2
N-tot 50.2 29.2 41.8
TP 6.4 0.17 97.3

The plant has proved to be operator friendly and require very little supervision. Average treatment results for Steinsholt treatment plant in the period 1992–1994 are shown in the table above. The plant has performed very well with stable results and few mechanical problems.